Používate zastaralý prehliadač, stránka sa nemusí zobraziť správne, môže sa zobrazovať pomaly, alebo môžu nastať iné problémy pri prehliadaní stránky. Odporúčame Vám stiahnuť si nový prehliadač tu.
Elektrické vedenie elektrina seps
Ilustračné foto SEPS
25. januára 2016 13:37 OstatnéNews in English od vEnergetikeSITA

Hungarians stop new power lines projects

The approval of the contract on the construction of two power lines, which is to be signed by the Slovak national grid operator SEPS and the Hungarian transmission grid operator MAVIR, has been delayed by the Hungarians.

The Slovak-Hungarian power lines will be completed a year later, in 2019. The approval of the contract on the construction of two power lines, which is to be signed by the Slovak national grid operator SEPS and the Hungarian transmission grid operator MAVIR, has been delayed by the Hungarians. „The preparations for the construction of two 2×400 kV power lines Gabcikovo – Gonyu – Velky Dur and Rimavska Sobota – Sajoivanka reached the stage of the territorial proceedings. The construction of the power lines will start after obtaining the territorial decision and building permit,“ the head of the communication department at SEPS, Norbert Deak, informed the portal vEnergetike.sk.

Full story in Slovak: Maďari zabrzdili projekty výstavby nových vedení

Témy

Odporúčané články

Najčítanejšie za 24 hodín

Odporúčame

Zavrieť

Používaním tejto stránky súhlasíte s ukladaním cookies. Viac info tu...